• DE
  • EN
  • Login
Logo

Faculty of Geosciences
FB5
Faculty of
Geosciences
FB5
    ⌂
  • Faculty
  • Studies
  • Research
  • Organization
  • Public
  • Internal
    • Students
    • Prospective Students
    • Prospective Students
    • Pupils
    • Pupils
    • PhD Students
    • Visitors
    • Employees
☰
  • DE
  • EN
  • Login
  • ⌂
  • ⌂

Task 1

For remediation work on the end of a refinery bar, contaminated soil should be excavated, deposited on a pile and covered with foil. A rectangular area of 50 x 100 m is available for this purpose. Under the condition that the slope angle of 25° on no flank should be exceeded, calculate the height H, surface A and volume V the pile can reach in the maximum expansion.



Geben Sie die Werte jeweils auf vier signifikante Stellen gerundet an!

Angular point H [m]
Surface A [m2]: (without base surface)
Volume V [m³]:
continue
☰
Contact

Faculty of Geosciences

University of Bremen
Klagenfurter Str. 2-4

28359 Bremen
Germany

Legal Notice
Data Privacy